LTRA was the prime consultant for the 5.3 miles of a freeway construction project with an estimated construction cost of $21…
LTRA was assigned to prepare the PS&E for the replacement of the main bridge and relief structure. This project was…
LTRA was the prime consultant for Section 2.1 from 0.33 miles S. of Franz Road to 0.56 miles North of…
LTRA was the prime consultant for the traffic management plan along Post Oak Boulevard from Richmond Avenue to IH 610…
LTRA was the prime consultant for the 1.20 miles of a new roadway from Merrifield Road to Mountain Creek Parkway.…
LTRA was the prime consultant for the design and reconstruction of St. Augustine Road from Silvermeadow to Angelus and from…
In November, LTRA donated 6,398 cans of food to the North Texas Food Bank. This donation provided 4,641 pounds of…
The LTRA survey team volunteered time and equipment to measure the record-breaking Fleur-de-lis mosaic for the Circle Ten Council Boy…