LTRA set the primary and secondary survey control for all design and construction for the 28-mi project. LTRA coordinated activities…
LTRA provided survey support services to another consultant to include verifying primary survey control, establishing secondary control, performing topographic survey…
LTRA provided survey support services on this PS&E project for another consultant. Tasks included establishing survey control points at 500…
LTRA provided survey services related to proposed improvements to 8+ miles of IH 35E from downtown Dallas to IH 20,…
LTRA provides on-call construction staking services related to a 2-mi complete rebuild of a major thoroughfare in eastern Fort Worth. …
LTRA provides on-call as-built verification services for the construction management team representing DART and overseeing construction of the DART Orange…
LTRA was hired by a consultant to provide right of way mapping services related to a realignment of an existing…
LTRA provided survey services related to preparing the existing Right of Way map as well as preparing the legal descriptions…
LTRA, working for the TxDOT Odessa District, performed control and topographic surveying related to the proposed upgrading of an existing…
LTRA, working for the TxDOT Amarillo District, performed a control survey for a 2-mi segment of IH 40 in Amarillo…