LTRA provided survey services to another civil consultant for a Dallas County Bike Trail project totaling nearly 8 miles in…
LTRA was the section designer working with the GEC on the Southeast Line Section 1 for the DART light rail…
LTRA was the prime provider for Section 2 of the Trinity Parkway project, a new location, six-lane divided tollroad facility…
LTRA was a member of the NorthGate Constructors Design Build team working in collaboration with the Texas Department of Transportation…
As the prime consultant, LTRA was responsible for project management, topographic survey, preparation of existing utility maps, retaining wall layouts,…
LTRA was the prime consultant for the 5.7 miles of reconstruction of IH 35E in Dallas and Ellis counties. The…
LTRA was the prime consultant for this NTTA project which consisted of converting existing ramp plazas to electronic toll collection…
LTRA was the prime consultant for the 5.3 miles of a freeway construction project with an estimated construction cost of $21…
LTRA was assigned to prepare the PS&E for the replacement of the main bridge and relief structure. This project was…
LTRA was the prime consultant for Section 2.1 from 0.33 miles S. of Franz Road to 0.56 miles North of…