DALLAS COUNTY HONEY SPRINGS BIKE TRAIL

LTRA provided survey services to another civil consultant for a Dallas County Bike Trail project totaling nearly 8 miles in length.  Tasks included establishing project primary and secondary survey control, performing topographic surveying for the design of the proposed trail, detailed surveys at intersecting streets, locating existing utilities, verifying existing drainage structure details, performing channel cross sections at various locations, research to verify fee title of the existing Oncor transmission corridors, and property surveys to establish boundaries.