LTRA provided survey services to another civil consultant for a Dallas County Bike Trail project totaling nearly 8 miles in…
LTRA, working for the TxDOT Amarillo District, performed a control survey for a 2-mi segment of IH 40 in Amarillo…
LTRA, working for the TxDOT Odessa District, performed control and topographic surveying related to the proposed upgrading of an existing…
LTRA provided survey services related to preparing the existing Right of Way map as well as preparing the legal descriptions…
LTRA was hired by a consultant to provide right of way mapping services related to a realignment of an existing…
LTRA provides on-call as-built verification services for the construction management team representing DART and overseeing construction of the DART Orange…
LTRA provides on-call construction staking services related to a 2-mi complete rebuild of a major thoroughfare in eastern Fort Worth. …
LTRA provided survey services related to proposed improvements to 8+ miles of IH 35E from downtown Dallas to IH 20,…