As part of the Blueridge Transportation Group team, LTRA was selected to provide drainage design support and subsurface utility engineering for the Texas Department of Transportation’s SH 288 Toll Lanes project in Harris County.
The SH 288 Toll Lanes project is 25.2 miles in length from US 59 to County Road 60 (SH 99). The project consists of four toll lanes within the existing SH 288 median, I-610 interchange reconstruction, eight direct connectors at the Beltway 8 interchange, and reconstruction of SH 288 and an additional general purpose lane in each direction on I-610 to Beltway 8.